Fabricated per drawings for sintering crushers, CDQ coke plants, coal handling and mining equipment; new fabrication and hardfacing repair / rebuild service available
PROJECT |
SPECIFICATIONS |
PROJECT |
SPECIFICATIONS |
Fabrication |
Per customer drawings |
Overlay hardness |
HRC 58-62 |
Base material |
Q355B / 45# / cast steel / heat-resistant steel |
Overlay |
Chromium carbide (Cr7C3) CCO |
Thickness |
Base & overlay per drawings |
Fixing method |
Countersunk bolts / weld studs / paste |
Service |
New fabrication & repair rebuild |
Warranty |
12 months against material defects |
Lead time |
25-35 days after drawing & PO |
Packing |
Seaworthy ISPM-15 pallet, VCI protection |
Copyright © Shenyang Hard Welding Surface Engineering Co., ltd. - Privacy policy